Search for collections on Universitas Islam Negeri Sultan Syarif Kasim Riau Repository

ANALISIS OPTIMASI BIAYA DAN WAKTU DENGAN METODE PERT DAN TCTO (Studi Kasus: Proyek Pembangunan Jembata Sei Merangin Kabupaten Kampar)

Riska Wulandari, - (2019) ANALISIS OPTIMASI BIAYA DAN WAKTU DENGAN METODE PERT DAN TCTO (Studi Kasus: Proyek Pembangunan Jembata Sei Merangin Kabupaten Kampar). Skripsi thesis, Universitas Islam Negeri Sultan Syarif Kasim Riau.

[img]
Preview
Text
1. COVER.pdf

Download (292kB) | Preview
[img]
Preview
Text
3. LEMBAR PENGESAHAN.pdf

Download (850kB) | Preview
[img]
Preview
Text
7. ABSTRAK.pdf

Download (428kB) | Preview
[img]
Preview
Text
8. KATA PENGANTAR.pdf

Download (450kB) | Preview
[img]
Preview
Text
9. DAFTAR ISI.pdf

Download (517kB) | Preview
[img]
Preview
Text
14. BAB I.pdf

Download (480kB) | Preview
[img]
Preview
Text
15. BAB II.pdf

Download (1MB) | Preview
[img]
Preview
Text
16. BAB III.pdf

Download (518kB) | Preview
[img] Text
17. BAB IV.pdf
Restricted to Repository staff only

Download (1MB)
[img]
Preview
Text
18. BAB V.pdf

Download (258kB) | Preview
[img]
Preview
Text
19. DAFTAR PUSTAKA.pdf

Download (509kB) | Preview
Item Type: Thesis (Skripsi)
Subjects: 500 Ilmu-ilmu Alam dan Matematika > 510 Matematika
Divisions: Fakultas Sains dan Teknologi > Matematika
Depositing User: Ari Eka Wahyudi
Date Deposited: 13 Sep 2019 04:15
Last Modified: 13 Sep 2019 04:15
URI: http://repository.uin-suska.ac.id/id/eprint/20166

Actions (login required)

View Item View Item