Wresni Anggraini, - and Harpito and Merry Siska, - and Dian Novitri (2022) Implementation of Lean Construction to Eliminate Waste: A Case Study Construction Project in Indonesia. Jurnal Teknik Industri, 23 (1). ISSN Print ISSN 1978-1431 | Online ISSN 2527-4112
|
Text
Paper Implementation ok.pdf Download (1MB) | Preview |
Abstract
Lean Construction (LC) presented innovative practices to maximize the production value and minimize the production waste during construction. The problem that frequently occurs in the project is delaying the schedule, leading to time and cost overrun. This research aims to eliminate waste that causes delay and inefficiency. Several LC techniques were carried out to improve the efficiency of this project, namely: Value Stream Mapping (VSM) to discover wastes and determine Process Efficiency Cycle (PCE); Waste Assessment Model (WAM) to identify the inter-relationship among wastes; Fishbone (Ishikawa) diagram analysis to get the root cause of the waste. Research results showed the three highest wastes: defect 14.06%, over production 21.44%, and the highest rank was unnecessary inventories 31.73%. After implementing LC techniques, the PCE increased from 72 % to 79%. The implication of this research is to provide recommendations to the project’s stakeholders in running the building construction to avoid delay and inefficiency.
Item Type: | Article |
---|---|
Subjects: | 600 Teknologi dan Ilmu-ilmu Terapan > 620 Ilmu Teknik |
Divisions: | Fakultas Sains dan Teknologi > Teknik Industri |
Depositing User: | Ari Eka Wahyudi |
Date Deposited: | 10 Apr 2023 14:58 |
Last Modified: | 10 Apr 2023 14:58 |
URI: | http://repository.uin-suska.ac.id/id/eprint/69714 |
Actions (login required)
View Item |